Walnut Creek Trail
Walnut Creek Trail at Trailwood Drive
Creating connections
UPDATED: FEB 1, 2023
The Walnut Creek Greenway Trail at Trailwood Drive project extended the Walnut Creek Trail, from near its intersection with Avent Ferry Road, along an existing sewer easement that parallels Walnut Creek, to Trailwood Dr. With this project complete, users of the Walnut Creek Trail will no longer have to use the sidewalk along Avent Ferry Road to connect between Trailwood Drive and the Walnut Creek Trail’s intersection with Avent Ferry Road. Users of the Walnut Creek Trail can now utilize a continuous 10-foot-wide asphalt trail between these two points.